|
The glue for lamination is a two part urac glue with 3/4" ring
shank bronze fasteners every three inches for clamping. All bulkheads
are constructed on a thickened laminated area, much like a leaf spring,
with 2" x 4" studs, 6" on center (OC) with 3 layers of
1/4" ABX plywood laminated on each side. These bulkheads are watertight
bulkheads with collision doors.
The deck is two layers of 1/2" ABX laminated plywood. Both hull and
deck are covered with four layers of fiberglass and eight layers at all
hard corners. All bilge areas and ballast areas are coated with woven-roven
fiberglass.
Interior
Construction
It is an exquisite sailing vessel complete with teak wood throughout,
ash inlays, brass fixtures,
|
ample portholes and skylights, washer/dryer, and water maker.
A large day cabin has plenty of open floor
space for dancing and active games.
The
fully equipped galley has a standard-size refrigerator, freezer, garbage
disposal, trash compactor, and gas stove and oven.
The dining room boasts an elegant gimbaled, rosewood and walnut dining
table that seats eight. There are two private heads with showers.
"Frank
Edmund Design" Page
1
"Boat
Specs" Home
|